Skip to content
pandatutor® Log in
Cover of Downtown waterfront project, mass. R-77, site preparation contract "v", permission to reject all bids and readvertise

Downtown waterfront project, mass. R-77, site preparation contract "v", permission to reject all bids and readvertise

by Boston Redevelopment Authority

1975 eng

...due to a difference of opinion between the BRA and the contractor, D. Federico, on the use of sheeting for water lines, the bids were rejected...

Read online

Reader not loading? Open it on Archive.org instead.